Customization: | Available |
---|---|
After-sales Service: | Online Technical Support, Free Spare Parts |
Size: | Customized |
Still deciding? Get samples of US$ 5/Piece
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Product Description
Product Name | EPDM & NBR/PVC Rubber Foam Pipe Heat Resistant Insulation Tube for Condensate Pipe |
Fireproof | Grade a (GB8624) |
Thickness | 10mm 13mm 15mm 18mm 20mm 23mm 25mm 28mm 30mm |
Length | as Your Request |
Width | as Your Request |
Applications
Packing & Shipping
Standard packing:
1. Woven bags (color is white/blue/orange etc,shipping marks will print on bag or stick on bag)
2. PPbag,with adhesive sticker,shipping marks will print on label,and put on PP bag.(PP bag color is transparent/red/black/green etc).
3. Pallets, according to clients requirements.
Product Category
Company Profile
Anhui Sa Tuo New Material Technology Co., Ltd
Anhui Sa Tuo New Material Technology Co., Ltd., located in Xuanzhou Economic Development Zone, Xuancheng City, Anhui Province, covers an area of more than 60,000 square meters, with a registered capital of 56 million yuan. The total number of staff 350 people, senior engineer 8 people, intermediate engineer 15 people, 135 technical personnel.Q1: Are you Factory?
A1: Yes, we have our own factory and technical team.
Q2: How many workers in your factory?
A2: We have 185 workers and 80% of them have been working for us over 5 years.
Q3: How do you make QC control?
A3: We have 10 inspectors inspect from raw material, sample, operation, semi-product to final product.
Q4: Are customized and small order available?
A4: Yes, samples or drawings are enough. Either 1pcs or 1000pcs are available.
Q5. What about the lead time?
1) 3--5 days for sample.
2) 15--20 days for mass production. If urgent,we have green channel
Q6: How do you deal with complaint from customers?
A6: We replace order or make reimbursement if it is our responsibilities.